“Can you deliver by…?” is a question SUKEAUTO answers every week. The honest answer depends on the route your order takes and how it travels. Here are the real numbers.
Lead Time by Route
| Route | Sampling | Production |
|---|---|---|
| Plain stock item | — | Ships 3–5 days after payment (orders under 10,000 pcs) |
| Custom colour on an existing mould | — | About 10 days |
| Logo on an existing mould | 25–35 days | 20–25 days after deposit |
| New TPR mould | 25–35 days | 30–45 days after sample approval |
| New slow-rise PU mould | 25–30 days | Quoted with the design |
When our production is fully booked, plan for about 40 days after the deposit clears.
Sampling Time
Sampling starts when we have what we need: for a custom shape, the 3D file (STL or STEP); for a logo, the vector artwork; plus the sample fee. Approving the sample quickly is the easiest way to protect your date.
Air vs Sea Transit
From what we see on real shipments: sea door-to-door to the US West Coast takes around 25–28 days after sailing; DDP sea 28–33 days; fast sea DDP to Europe 25–28 days door-to-door; air roughly 5–12 days depending on destination. Small orders usually fly; larger orders go by sea. See EXW, FOB or DDP?.
Working Back from Your Event or Launch Date
In-hand date − transit − production − sampling = the latest day to order. Two examples:
- Stock dumplings by sea to the US: 3–5 days + about 30 days ≈ order 6 weeks before you need them.
- Logo squishies on an existing mould by sea: 25–35 + 20–25 + about 30 days ≈ order 12–14 weeks ahead.
Add a buffer for public holidays in China, especially Chinese New Year, when factories close for several weeks.
Rush Orders: What Is Realistic
Only stock moves fast. If your date is close, choose stock items and air freight; we don’t compress sampling or production on custom work to chase a date, because that is how quality slips. For holiday timing, see holiday squishy order deadlines.
Large Orders and Scheduled Deliveries
Large orders can ship in scheduled batches, each inspected on its own before dispatch.
What Buyers Ask SUKEAUTO About Timing
Timing questions are the fastest-growing topic in our squishy inbox. 42 of the 408 squishy buyers who wrote to SUKEAUTO between July and October 2026 asked about lead time or delivery — 4 in July, 6 in August, 12 in September and 20 in October, as holiday buyers began working back from their selling dates. Most ask one of three things:
- “How long until it arrives in my country?” — the door-to-door number, not just production.
- “How long is production after I approve?” — buyers who already have a sample.
- “Can you make my date?” — buyers with an event, launch or season already fixed.

Each of those is a different number, so SUKEAUTO always answers with the full chain: sampling, production, inspection and transit.
The Full Timeline, Stage by Stage
1. Inquiry to quote. Send the item, quantity, destination and any logo or packaging files. Stock items can be quoted straight away; custom shapes need a 3D file (STL or STEP) before tooling can be quoted.
2. Sample. Logo or custom-colour samples on an existing mould take 25–35 days; a new TPR mould takes 25–35 days to the first sample, slow-rise PU 25–30 days. A colour-only change on an existing mould is about 10 days.
3. Approval. The approved sample becomes the production standard for colour, print position and finish. Fast feedback here protects your date more than anything else.
4. Production. Logo or custom-colour work runs 20–25 days after the deposit; a new mould runs 30–45 days after sample approval. In peak season, when the line is fully booked, plan for about 40 days after the deposit clears.
5. Inspection and video. Every order is 100% inspected before packing. SUKEAUTO films the finished goods — cartons opened, random pieces squeezed — and sends photos of the product, packaging and outer cartons before the balance is paid.
6. Transit. From what we see on real shipments: sea door-to-door to the US West Coast around 25–28 days after sailing; DDP sea 28–33 days; fast sea DDP to Europe 25–28 days; air roughly 5–12 days depending on destination.
Lead Time Worked Examples
| Order | Sampling | Production | Transit (sea) | Order this far ahead |
|---|---|---|---|---|
| Stock dumplings, no logo | — | 3–5 days | about 30 days | about 6 weeks |
| Custom colour on stock mould | about 10 days | — | about 30 days | about 7 weeks |
| Logo on stock mould | 25–35 days | 20–25 days | about 30 days | 12–14 weeks |
| New TPR shape | 25–35 days | 30–45 days | about 30 days | 16–18 weeks |
By air, subtract about three weeks from the sea column.
What Slows an Order Down
- Missing files. A 2D sketch cannot be tooled; a raster logo cannot be printed cleanly. Send vector artwork and a 3D file up front.
- Slow sample approval. Each extra round adds days to sampling.
- Changes after approval. A new colour or print position after approval restarts that step.
- Chinese New Year. Factories close for several weeks around the holiday, usually between late January and February. Add 3–4 weeks to any order that crosses it.
- Peak season. Halloween and Christmas production fills the line from late summer; confirm early.
How SUKEAUTO Keeps Large Orders on Schedule
Large orders can ship in scheduled batches, each inspected on its own before dispatch, so the first part of your order can sell while the rest is produced. Tell us the in-hand date for each batch and we plan the line around it.
More Timing Questions
Does SUKEAUTO offer rush production on custom items? No. We don’t compress sampling or production on custom work, because that is where quality slips. For a close date, choose stock items and air freight.
When does the production clock start? For logo and colour work, when the deposit clears; for a new mould, when you approve the sample.
Is transit time included in the lead time you quote? SUKEAUTO quotes production and transit separately, and give you the door-to-door total.
Can SUKEAUTO deliver to a marketplace fulfilment centre or 3PL warehouse? Yes, on DDP terms; send the warehouse’s label requirements before production.
How do I track my shipment? SUKEAUTO sends shipping documents and tracking once goods leave the factory.
What if my event date is fixed and close? Tell us the date first. We will say honestly whether stock by air can make it, or whether it can’t.
What Buyers Should Send to Get a Firm Date
A date is only as firm as the information behind it. To give you a reliable schedule, SUKEAUTO needs:
- The item and route — stock, custom colour, logo on stock, or new mould.
- The quantity per design and per colour.
- Final files — vector logo, packaging dielines and, for a new shape, the 3D file.
- The delivery address and Incoterm — EXW, FOB or DDP.
- The in-hand date — the date goods must be at your door, not the date you want them shipped.
With these five items, we can tell you on the first reply whether your date works by sea, only by air, or not at all — and suggest the change that would make it work.
Sea or Air: A Simple Rule
Choose sea when the order is large or the date is comfortable; choose air when the order is small, the margin per piece is high, or the date is close. Air costs more per kilo but buys back about three weeks. Many buyers split a first order: a small air shipment to launch, and the bulk by sea to follow.
The Short Version
Tell SUKEAUTO the date goods must be at your door, and we work backwards: transit, inspection, production and sampling. Stock moves in days; branded work needs about three months by sea.
Chinese New Year: The Biggest Date in the Factory Calendar
Most factories in southern China close for Chinese New Year, which falls between late January and mid-February. The effect on lead times is larger than the holiday itself:
- Before the holiday, factories run at full capacity for four to six weeks, and new custom work is often not accepted in the final weeks because it cannot be finished before the break.
- During the holiday, production stops for roughly two to three weeks, and freight forwarders and ports slow down too.
- After the holiday, workers return over several weeks. Capacity is often around half to two-thirds in the first week back and reaches normal levels only two to three weeks later.
Practical rules: confirm custom orders well before the holiday, expect orders placed during the shutdown to start only after the factory reopens, and add two to three weeks to any lead time that crosses the holiday.
Freight Peak Season
Transpacific and Asia–Europe shipping has its own busy season. Carriers add peak-season surcharges and space becomes tight from mid-year, when goods for back-to-school, Halloween and the winter holidays all move at once. In busy years, sailings fill up, ports are congested and containers wait to unload. For holiday goods, book freight early and allow a buffer of a week or more for delays.
The Lead-Time Arithmetic at SUKEAUTO
| Stage | Stock item | Logo on a stock item | New mould |
|---|---|---|---|
| Sample | Stock sample by courier | 25–35 days | After tooling, 25–35 days |
| Production | Ships 3–5 days after payment | 20–25 days after deposit | 30–45 days after sample approval |
| Freight to the US West Coast by sea | About 25–28 days door to door after sailing | Same | Same |
| Air | About 5–12 days | Same | Same |
When production is fully booked in peak season, plan on about 40 days after the deposit for production. Add the Chinese New Year effect if the order crosses it.
How to Get a Firm Date
A firm date depends on information only you have. Send SUKEAUTO:
- The date the goods must be in your hands.
- The delivery address or port.
- Whether you need sea, air or a split.
- Your artwork and packaging, approved, for branded orders.
- Any testing that must be done before shipping.
SUKEAUTO then works backwards from your date and tells you the latest order date that still works.
Key Terms
- In-hand date — the date goods must arrive at your door.
- Peak-season surcharge — an extra freight charge during the busiest shipping months.
- Production slot — the time reserved for your order on the production schedule.
Does SUKEAUTO close for Chinese New Year? Yes. Like most factories in China, SUKEAUTO pauses production over the holiday; confirm orders early.
Can stock ship during peak season? Yes. SUKEAUTO stock ships 3–5 days after payment, but freight space is tighter and slower in peak months.
What is the fastest route for a late order? A stock item by air; SUKEAUTO stock ships in 3–5 days and air freight takes about 5–12 days.
Sources: SUKEAUTO inquiry inbox — 408 squishy buyers by email and WhatsApp, July–October 2026.
Tell us your in-hand date and destination and we’ll work back the plan with you. Back to custom squishy toy manufacturer.
Send Your Inquiry
Tell us the style, quantity, logo or packaging you need and your target date — we reply with the right route and a price range.
Leave A Comment